VoltisOps ingests your power plants, transmission assets, and future projects, determines exactly which NERC and local authority standards apply to each one, and generates the procedures and tasks required to stay compliant.
Every plant, substation, and line has its own mix of applicable standards — and every new project adds another set. Most companies track this in spreadsheets that fall out of date the moment a standard changes or a project moves forward.
Which NERC standards and local authority rules apply depends on an asset's size, criticality, jurisdiction, and role in the grid — not a single company-wide checklist.
Planned plants and lines carry compliance obligations before they're ever energized, but most tracking tools only cover what's already in service.
When NERC or a local authority updates a requirement, every affected asset needs to be re-assessed — a manual exercise that's easy to fall behind on.
Identifying an applicable standard is only half the job. Turning it into a scheduled, assignable task is where most tracking spreadsheets stop.
VoltisOps takes your existing and planned assets, determines what applies, and hands your team a concrete to-do list — not just a list of standard numbers.
Four steps, and VoltisOps keeps re-running them as your fleet and the standards themselves evolve.
Import existing power plants, transmission facilities, and planned projects — with ownership, jurisdiction, and interconnection details.
VoltisOps cross-references each asset against NERC Reliability Standards and applicable local or regional authority requirements.
Receive the specific compliance procedures, tasks, and deadlines required for each asset and for the company as a whole.
As standards evolve or new projects are added, VoltisOps re-assesses applicability and updates the task list automatically.
Federal reliability standards are only part of the picture — VoltisOps also tracks the state, regional, and municipal requirements layered on top of them.
VoltisOps is designed to sit underneath a whole portfolio of generation and transmission assets, not a single interconnection study.
See applicability and open tasks rolled up across your entire fleet, or drilled down to a single substation.
New NERC guidance, a local authority update, or a newly added project all trigger a fresh applicability pass automatically.
Bring a handful of assets — existing or planned — and we'll walk through what VoltisOps determines applies, and what it generates.