Software built from the inside of the problem
Simoolate started from a simple observation: the engineers doing interconnection and compliance work were spending most of their time on things software should be doing — running the same study across multiple simulation engines by hand, manually tracking which standards applied to which asset, and translating standards into task lists one spreadsheet at a time.
Rather than build generic engineering software and hope it fit, we built Voltis and VoltisOps around the exact workflows our own team had already spent over a decade running for real clients. That's also why we teach — the FE, PE, and PMP exams are the same ones our engineers sat before doing this work.
13+
Years in grid interconnection, simulation, and NERC compliance
5–800 MW
Range of power plants modeled, studied, and compliance-tested
International
Projects across North America, Europe, and Australia
New Standards
Spearheading the validations for new requirements for renewables and large loads